myELEXON

I'm not logged in iconWelcome
Email:

Password:

 Help

Print This Page Print This Page Icon

Modification Proposal P204

Scaled Zonal Transmission Losses (Closed)

Current Status

On 17 July 2008, the Authority published an open letter (see below) stating it was no longer in a position to reach a decision on the following Modification Proposals:

  • P198 - Introduction of a Zonal Transmission Losses scheme
  • P200 - Introduction of a Zonal Transmission Losses scheme with Transitional Scheme
  • P203 - Introduction of a seasonal Zonal Transmission Losses scheme
  • P204 - Scaled Zonal Transmission Losses

These Modification Proposals are therefore closed. If you have any questions please contact David Jones (david.jones@elexon.co.uk) on 020 7380 4213.

Proposer: John Capener (British Energy)

Current Phase: Closed

Modification's Lifecycle

Below is a chronology of this Modification’s lifecycle. Dates may be subject to change, therefore if you wish to attend a meeting or require further information, please contact the Lead Analyst. To download documentation relating to this Modification Proposal please use the document basket.

Refer to the drop-down menu below to view the details of a different Modification Proposal.

Document Title Documents to add to basket Notifying of updated documents
Word Icon Modification Proposal (83Kb)
PDF Icon Attachment 1: Graphical Representation of Proposed Zonal Scaling (306Kb)
Word Icon P204 Initial Written Assessment (431Kb)
PDF Icon Slides from Transmission Losses Seminar - 5 July 2006 (615Kb)
PDF Icon P204 Non-Confidential Party Impact Assessment Responses (38Kb)
PDF Icon P204 Proposed Modification Transmission Company Analysis (35Kb)
PDF Icon P204 Proposed Modification BSC Agent Impact Assessment (150Kb)
PDF Icon P204 Proposed Modification Requirement Specification (712Kb)
PDF Icon P204 Assessment Consultation Document (532Kb)
PDF Icon P204 Cost-Benefit Analysis (383Kb)
PDF Icon P204 Consultation Addendum Memorandum (81Kb)
Word Icon P204 Consultation Assessment Questions (111Kb)
PDF Icon P204 Assessment Procedure Consultation Responses (455Kb)
PDF Icon P204 Assessment Report (543Kb)
PDF Icon P204 Assessment Report Attachment - Draft Proposed Modification Legal Text (139Kb)
PDF Icon P204 Report Phase Consultation Document - Draft Modification Report (210Kb)
PDF Icon P204 Report Phase Consultation Attachment - Draft Proposed Modification Legal Text (139Kb)
Word Icon P204 Report Phase Consultation Questions (104Kb)
PDF Icon P204 Report Phase Consultation Responses (545Kb)
PDF Icon P204 Draft Modification Report for BSC Panel (253Kb)
PDF Icon P204 Draft Modification Report Attachment: Draft Proposed Modification Legal Text (140Kb)
PDF Icon Actual Transmission Losses Modification Proposal Progression Costs (correct as of November 2006) (36Kb)
PDF Icon P204 Final Modification Report (220Kb)
PDF Icon P204 Final Proposed Modification Legal Text (139Kb)
PDF Icon Ofgem Letter to BSC Panel Requesting Clarification of OXERA Cost-Benefit Analysis (142Kb)
PDF Icon OXERA Response to Ofgem Letter Regarding Clarification of Cost-Benefit Analysis (100Kb)
PDF Icon Further question on Oxera cost benefit analysis for Transmission Losses Modification Proposals (25Kb)
PDF Icon Further queries on OXERA cost-benefit analysis for Transmission Losses Modification Proposals (59Kb)
OXERA estimated TLF values 2006/7 - 2014/15 (131Kb)
PDF Icon Ofgem's letter to ELEXON on BSC Modification Proposals on Zonal Transmission Losses - review of Oxera's analysis (25Kb)
PDF Icon ELEXON's Response to Ofgem's letter (18Kb)
PDF Icon Ofgem's Review of Oxera Analysis - Request for Clarifications (34Kb)
PDF Icon Ofgem's Review of Oxera analysis - clarification responses (107Kb)
Oxera request Ofgem request for additional information - 22 January 2008 (19Kb)
PDF Icon Ofgem Update Letter on P198/P200/P203/P204 decision-making process (27Kb)
PDF Icon Ofgem Open Letter - July 2008 (35Kb)
Registered office: 4th Floor 350 Euston Road London NW1 3AW   Reg Co No: 3782949 Registered in England and Wales