Modification Proposal P211

Main imbalance price based on ex-post unconstrained schedule (Rejected)

Current Status

P211 was raised by EDF Energy on 16 April 2007.

P211 sought to amend the calculation of the ‘main’ imbalance price such that, when the market is short and System Buy Price (SBP) is the main price, then it was to be based on the least expensive Offers that the System Operator (SO) could utilise on an unconstrained system. Conversely, when the system is long and System Sell Price (SSP) is the main price, then it was to be based on the least cost Bids that the SO could have utilised on an unconstrained system. This was to be achieved by creating a new Ex-Post Unconstrained Schedule (EPUS). Price Average Reference (PAR) tagging would then be applied to the EPUS to ensure that only the most expensive 500MWh of Bids or Offers that the SO could utilise (to resolve the energy imbalance in an unconstrained system) were used to set the main price. The ‘reverse’ price would have remained unchanged.

At its meeting on 10 May 2007, the BSC Panel considered the Initial Written Assessment and agreed that P211 proceed to the Assessment Phase. An Assessment Report was presented to the BSC Panel at its meeting on 13 September 2007 in which the Panel agreed by majority with the Modification Group's recommendation that the Proposed Modification should not be made. A draft Modification Report was presented to the BSC Panel on 11 October 2007. The final Modification Report was submitted to the Authority on 22 October 2007. The BSC Panel provided a majority recommendation to the Authority to reject P211.

In considering whether to approve P211, the Authority conducted a Regulatory Impact Assessment (RIA). P211 and two other Pricing Modifications (P212 were P217) were mutually incompatible (only one could be in place at any one time).The RIA can be found on Ofgem's website.

In October, Ofgem rejected P211 and approved P217 (Alternative). The decision letter is published in the table at the bottom of this page.

Proposer: EDF Energy (EDF Energy)

Current Phase: Rejected

Modification's Lifecycle

Below is a chronology of this Modification’s lifecycle. Dates may be subject to change, therefore if you wish to attend a meeting or require further information, please contact the Lead Analyst. To download documentation relating to this Modification Proposal please use the document basket.

Refer to the drop-down menu below to view the details of a different Modification Proposal.

DateEventDocument TitleDocument StatusStatus Documents to add to basket Notifying of updated documents
16/04/2007Modification Proposal P211 raised - Attachment 1 PDF Icon P211 Attachment 1: Main imbalance price based on ex-post unconstrained schedule (50Kb)  Confirmed
16/04/2007Modification Proposal P211 raised PDF Icon P211 Modification Proposal (49Kb)  Confirmed
10/05/2007Initial Written Assessment (IWA) presented to the BSC Panel PDF Icon P211 Initial Written Assessment (240Kb)  Confirmed
15/05/2007First Assessment Procedure Modification Group Meeting held PDF Icon P211 Proposer's Slides (183Kb)  Confirmed
22/05/2007Second Assessment Procedure Modification Group Meeting held No document neededConfirmed
06/06/2007Third Assessment Procedure Modification Group Meeting held No document neededConfirmed
13/06/2007Fourth Assessment Procedure Modification Group Meeting held No document neededConfirmed
18/06/2007Request for Transmission Company Analysis issued No document neededConfirmed
18/06/2007Change Request for BSC Agent Impact Assessment issued Coming soonConfirmed
18/06/2007Proposed Requirement Specification Published PDF Icon P211 Proposed Requirement Specification (288Kb)  Confirmed
19/06/2007Modelling Exercise undertaken No document neededConfirmed
02/07/2007Transmission Company Analysis returned PDF Icon P211 Transmission Company Analysis Responses (38Kb)  Confirmed
02/07/2007BSC Agent Impact Assessment Returned PDF Icon P211 BSC Agent Impact Assessment Responses (100Kb)  Confirmed
04/07/2007Fifth Assessment Procedure Modification Group Meeting held No document neededConfirmed
10/07/2007BSC Agent Impact Assessment for potential Alternative returned PDF Icon P211 BSC Agent Impact Assessment for potential Alternative responses returned (106Kb)  Confirmed
18/07/2007Modelling Exercise Results No document neededConfirmed
23/07/2007Sixth Assessment Procedure Modification Group Meeting held No document neededConfirmed
27/07/2007Change Request for BSC Agent Impact Assessment of potential Alternative issued No document neededConfirmed
27/07/2007P211 Alternative Requirement Specification published PDF Icon P211 Alternative Requirement Specification (429Kb)  Confirmed
30/07/2007Request for Transmission Company Analysis on potential Alternative issued No document neededConfirmed
09/08/2007Transmission Company potential Alternative analysis returned PDF Icon P211 Transmission Company Alternative Analysis responses returned (43Kb)  
13/08/2007Seventh Assessment Procedure Modification Group Meeting held No document neededConfirmed
15/08/2007Assessment Procedure Consultation issued PDF Icon P211 Assessment Procedure Consultation Document (451Kb)  Confirmed
15/08/2007Assessment Procedure Consultation Proforma issued Word Icon P211 Assessment Procedure Consultation Proforma (112Kb)  Confirmed
15/08/2007Assessment Procedure Consultation issued P211 Assessment Procedure Consultation Attachments (2.2Mb)  Confirmed
28/08/2007Assessment Procedure Consultation Responses returned PDF Icon P211 Consultation Responses (2.4Mb)  Confirmed
29/08/2007Eighth Assessment Procedure Modification Group Meeting held No document neededConfirmed
13/09/2007Assessment Report presented to the BSC Panel PDF Icon P211 Assessment Report (482Kb)  Confirmed
13/09/2007Assessment Report presented to the BSC Panel - Attachments P211 Assessment Report Attachments (3Mb)  Confirmed
18/09/2007Report Phase Consultation issued PDF Icon P211 Report Phase Consultation (234Kb)  Confirmed
18/09/2007Resport Phase Consultation - Attachment A: Legal Text PDF Icon P211 Legal Text (262Kb)  Confirmed
18/09/2007P211 Report Phase Consultation Proforma issued Word Icon P211 Report Phase Consultation Proforma (102Kb)  Confirmed
02/10/2007Report Phase Consultation Responses due PDF Icon P211 Report Phase Consultation Responses (1.5Mb)  Confirmed
11/10/2007Draft Modification Report presented to the BSC Panel PDF Icon P211 Draft Modification Report (235Kb)  Confirmed
22/10/2007Modification Report submitted to Authority P211 Final Modification Report (1.6Mb)  Confirmed
29/02/2008P211 Authority Decision - Deferred PDF Icon P211 Deferral Letter (28Kb)  Confirmed
16/10/2008P211 Authority Decision Rejected PDF Icon P211 Authority Decision - Signed (77Kb)  Confirmed
16/10/2008P211 Authority Decision Rejected PDF Icon P211 NGET Notice (29Kb)  Confirmed